Westchester, IL

Serving Westchester

Epoxy floors for Westchester repair bays and home garages, coated around lift base plates instead of under them.

Oak Lawn Epoxy Flooring has put more than 20 years into epoxy flooring in Westchester and across our service area, and the jobs that demand the most planning are the ones where something heavy gets bolted through the slab. A coating can be ground, primed and broadcast to a high standard and still cause trouble if it was laid where a steel plate should sit on bare concrete. This page is about those floors.

Our method does not change between a business and a homeowner. We open the concrete with a diamond grinder or a shot blaster rather than an acid etch, test for moisture before the price is settled, and write the product line, the coat count and the finished thickness into the proposal so the floor can be measured against it later.

We do not install, anchor or certify vehicle lifts, and we never present ourselves as if we did. What we do is plan a coating so the lift installer’s work and ours do not undo each other. That planning starts with knowing where every column will stand before the grinder makes its first pass.

Roosevelt Road Repair Bays and the Slab Under a Lift

A Westchester repair bay coating laid around the two-post lift base plates, never under them

Westchester’s working garages sit along Roosevelt Road. Westchester Automotive Repair at 10129 W Roosevelt Rd lists engine repair, tune-ups, tires and oil changes, and a Midas operates at 11105 W Roosevelt Rd; both addresses geocode inside the village, in Proviso Township of Cook County. We have no relationship with either shop and have not seen their floors or their equipment.

We name them because they show what kind of floor the village’s commercial work includes. Raising vehicles on lifts anchored into the floor is ordinary trade practice in repair bays, though which lifts these particular shops run is not something we know. Wherever a lift is anchored, the floor stops being only a surface to walk and roll on and becomes the lift’s foundation.

A Lift Stands on Concrete, Not on the Coating

A two-post lift carries a vehicle on two columns, and each column stands on a steel base plate bolted into the slab with anchors. The anchors grip the concrete, and the plate bears on it directly. Put a resin layer between the plate and the slab and the plate now rests on a material it was never meant to sit on.

One lift maker’s manual is blunt about it. The Tuxedo TP9KFX, a 9,000 lb surface-mounted two-post lift, says not to install the lift ‘on any surface other than concrete, conforming to minimum specifications.’ Our reading of that line is simple: the coating goes around the base plates, never under them.

Shims Are the Other Reason

Floors are rarely dead level, so installers shim column bases to bring the posts plumb. That same manual caps shim thickness at 1/2 inch. A coating with broadcast flake or quartz under a plate adds a layer of uneven height that the installer then has to account for, which is exactly the uncertainty a shim stack is supposed to settle.

Looking for epoxy-flooring closer to Lemont? See Epoxy-Flooring in Lemont.

Four and a Quarter Inches, 3,000 PSI, Six Inches From a Seam

The same manual sets out what the concrete under each column has to be. It calls for a compression strength of at least 3,000 psi and a minimum thickness of 4-1/4 inches, so the anchors can reach a minimum embedment of 3-1/4 inches. It also wants anchors at least 6 inches from any slab edge or seam, and it says not to install the lift over expansion joints or cracks.

These figures come from one manufacturer’s manual. They are not a Westchester code requirement, and another lift maker may set different numbers, so the installer works from the manual for the lift actually going in. What they hand a floor contractor is a list of questions to answer before coating, because a finished coating hides the evidence an installer needs to see.

What We Map Before We Coat

Our survey of any slab starts with cracks, spalls, joints and old coatings drawn on a plan. In a bay where a lift will stand, that map gains the column positions, so we can see whether a planned base plate lands on a saw cut, a cold joint or a crack line. If it does, that is a conversation for the owner and the lift installer before we grind, not after.

Thickness and strength cannot be read from the surface. Whether to drill or core to find out is the installer’s call, and we say plainly when a slab looks like it needs repair or replacement before it should carry a coating or a lift. Coating over doubt only makes the doubt harder to find later.

When the Anchors Will Not Hold

The manual also covers the failure case. If an anchor will not reach 130 ft-lbs of torque, it directs that the concrete under each column be replaced with a pad 4 feet by 4 feet by 6 inches of 3,000 psi concrete, left to cure before installing, typically 2 to 3 weeks. A new pad is fresh concrete with its own moisture to give up, so we test it with ASTM F2170 relative humidity probes before any coating goes near it.

Laying Out the Coating Around the Column Base Plates

Once the column positions are fixed, we treat each base plate footprint as bare concrete that stays bare. We mark every footprint with a margin agreed with the installer, grind the rest of the floor to an ICRI concrete surface profile suited to the system, and terminate the coating cleanly at each footprint rather than feathering it out.

Lift First or Floor First

There are two workable orders. If the lift is already in, we grind and coat around the plates in place, keeping the grinder and its vacuum clear of the anchors and the hydraulic lines. If the floor is new and the lift comes later, we leave the footprints uncoated on the installer’s layout so the plates can be set straight onto concrete.

Either way, the coating edge at each plate is a terminated edge, cut in by hand and sealed so traffic does not catch it. A clean edge is a deliberate line that the next coat and the next repair can return to. That is far easier to maintain than resin that was rolled up to a plate and squeezed under its rim.

Choosing a System for a Working Bay

A repair bay sees dropped tools, jack stands and rolling carts, and the floor beside a lift takes point loads every time a vehicle is positioned. For that duty we usually look at a 100% solids epoxy base with a quartz aggregate broadcast for grip, finished with a polyaspartic or polyurea topcoat chosen to resist hot tire pickup from vehicles that come in warm.

Grinding dust is captured at the machine with a vacuum rather than rinsed toward a floor drain or a storm inlet. Products are picked inside the Illinois VOC limits for floor and industrial coatings, which bind whoever applies them. Cure times are set by slab temperature and the dew point spread at the surface, not by the calendar.

A shop rarely wants its bays dark for long, so we phase the work. We split a floor into sections or use overnight and weekend windows when a business cannot close, and each section reopens only when its coating has cured enough to take traffic.

Moving a Lift, or Adding One at Home

Moving or Adding a Column After the Floor Is Done

A column moved later means new anchor holes drilled through a finished floor and an old footprint left behind. The new holes are the installer’s work, and the old footprint is ours. We grind the abandoned anchor holes flush, fill them with a repair material compatible with the system, and patch the coating so the former plate position no longer reads as bare concrete.

The new position goes through the same questions as the first: 6 inches clear of any seam, no joint or crack under the plate, and the concrete thickness that lift’s own manual asks for. Coating where the new plate will land has to come off back to bare concrete before the plate goes down. We plan that removal with the installer so the cut lines are clean.

A Lift in a Westchester Home Garage

Westchester is a village of owner-occupied homes, 90.8 percent of occupied units, so a car lift in a home garage is a project the owner will live with. Residential slabs were not necessarily poured with a lift in mind, and their thickness and strength are unknown until someone checks. The lift’s own manual sets the bar the slab has to clear, and the installer decides whether it does.

We bring the same questions to a home garage that we bring to a shop. Where are the control joints and cracks relative to the posts, and will the installer drill or core to confirm thickness? If a pad has to be poured, the coating waits until that pad has cured and passed a moisture test.

The Village of Westchester Community Development / Building Department handles permits, and we check its registration, bond and insurance rules before booking a job rather than assuming them. Whether coating an existing garage floor needs a permit is a question we put to the department directly.

A home job over the state threshold gets a written contract and the Illinois consumer-rights pamphlet before grinding starts. The warranty conversation comes first too, and moisture is the first exclusion we name, because a garage slab is often poured without a vapor retarder beneath it.

If you are planning a lift and a new floor together, send us the lift model and its manual along with a sketch of the garage. We will mark where the plates go, map and test the slab, and write a scope that leaves those footprints bare for the installer.

  • 20+ Years Coating Concrete
  • Moisture Tested Before Pricing
  • Free Written Estimates

What we do

Services Available in Westchester

A gray epoxy base coat being spread across a detached garage floor in Oak Lawn.

Epoxy Garage Floor

Ground, repaired and multi-coat epoxy garage floors built to shrug off road salt, hot tires and Oak Lawn winters.

Learn more
A polished concrete floor checked for clarity in a furniture showroom on an Oak Lawn commercial strip.

Polished Concrete Floors

Diamond-ground, densified and burnished polished concrete for retail, office and residential slabs, with no coating left to peel.

Learn more
A bicycle wheeled back into an Oak Lawn detached garage the same day its polyaspartic floor went down.

Polyaspartic Floor Coating

Fast-curing, UV-stable polyaspartic floor coatings for garages, showrooms and shops, applied over a diamond-ground slab.

Learn more
The sump lid set back on its basin in an Oak Lawn basement newly coated in warm gray epoxy.

Basement Floor Epoxy

Moisture-tested basement floor epoxy for laundry rooms, workshops and finished spaces, built around sump pits and floor drains.

Learn more
Silver and deep bronze metallic epoxy poured across the floor of a small salon suite in Oak Lawn.

Metallic Epoxy Floor

Marbled, pearlescent metallic epoxy floors for showpiece garages, basements, bars and showrooms, built on a flawless ground slab.

Learn more
A planetary grinder opening up an old sealed slab in a vacant medical office suite in Oak Lawn.

Concrete Grinding

Diamond grinding and shot blasting to strip old coatings, flatten slabs and cut a measured profile before any floor goes down.

Learn more
Repair mortar poured into a routed crack across an Oak Lawn detached garage slab before coating.

Concrete Floor Repair

Crack, spall, joint and salt-scaling repair for garage, basement and commercial slabs, done right before any coating goes on.

Learn more
Dining chairs slid back onto a new warm beige quartz floor in an Oak Lawn nursing home dining room.

Commercial Epoxy Flooring

Seamless commercial epoxy floors for dealerships, medical offices, retail, auto shops and offices, scheduled around your business hours.

Learn more
A static-dissipative floor with its copper grounding strip under an equipment rack in an Oak Lawn medical office building.

ESD Flooring

Static-dissipative and conductive epoxy floors for electronics assembly, labs, server rooms and clean spaces, tested after installation.

Learn more
Vinyl chip mid-broadcast over a wet base coat inside an Oak Lawn detached garage, the ranch house beyond.

Flake Epoxy Floor

Full-broadcast vinyl flake epoxy floors for garages, basements and shops, built to hide dust and wear and give grip underfoot.

Learn more
A forklift carrying steel plate across a heavy urethane cement floor in a fabrication shop in the industrial parks beside Oak Lawn.

Industrial Epoxy Flooring

Heavy-duty epoxy, urethane cement and quartz systems for warehouses, plants and fleet shops, built for forklift traffic and chemicals.

Learn more
A fryer rolled back into line on a textured urethane cement floor in an Oak Lawn restaurant kitchen.

Commercial Kitchen Flooring

Seamless, slip-resistant kitchen floors with integral coved bases for restaurants, bakeries and food prep, installed around service.

Learn more

Ready to Get Started?

Request a free quote today and we'll get back to you fast.